We bring better battery packs to market, faster.

Welcome to IONETIC,                            

                        a software-accelerated

battery pack development company.

Welcome to IONETIC, 
a software-accelerated battery development company                  

A better way to electrify.

Flexible design
Any energy, voltage, or power
Chemistry agnostic

Software-accelerated battery development.

IONETIC’s software-accelerated approach to battery development, brings custom battery packs to market faster than ever before. We’ve developed an integrated network of software tools, hardware components, and fabrication technologies for battery pack development, enabling us to rapidly develop, build, and industrialise custom battery packs to exact requirements. We call this network, Arc.

Working hand-in-hand with our world-class engineers, Arc enables us to bring battery packs to market faster, cheaper, and more reliably than anyone else.

50% faster time to market.

80%+ lower development cost.

Reduced programme risk.

IONETIC saves up to 2 years of battery development time.

End-to-end battery pack development
Customer Requirements
Attribute definition
Requirements cascade
Key constraints
Final pack requirements
Concept Definition
Cell selection engine
Pack design engine
E/E design engine
Performance evaluation
Programme planning
Detailed Design
Mechanical simulation
Vehicle integration
3D thermal simulation
SW integration
Manufacturing digital twin
Test & Certification
Prototype manufacture
DVP testing
Homologation
Vehicle-level SW validation
Line virtual commissioning
Launch Readiness
Line configuration

Product implementation
Quality PPAP process
Series manufacture

Ongoing QMS
Traditional Tier 1
3 Months
2 Weeks
12 Months
4 Months
24 Months
14 Months
9 Months
3 Months
Customer Requirements
Attribute definition
Requirements cascade
Key constraints
Final pack requirements
3 Months
2 Weeks
Concept Definition
Cell selection engine
Pack design engine
E/E design engine
Performance
Evaluation
Programme planning
3 Months
2 Weeks
Detailed Design
Mechanical simulation
Vehicle integration
3D thermal simulation
SW integration
Manufacturing digital twin
6 Month
3 Months
Prototype Test, Dev + Cert
Prototype manufacture
Laboratory DVP testing
In-Vehicle DVP testing
Homologation testing
Vehicle-level SW validation
Line virtual configuration engine
18 Months
12 Months
Launch Readiness
Line virtual configuration engine

Line set

Quality PPAP prove

Series manufacture

Ongoing QMS
9 Months
3 Months
Traditional Tier 1
>4 years
<2 years
9 Months
3 Months

Your requirements, made real.

We believe your battery pack shouldn't dictate the design of the rest of your vehicle. We believe the battery pack should serve as an enabler for the vehicle you want to build.

Our flexible design system is built around four different cell formats, is chemistry agnostic, and is practically infinite in the number of different voltage and energy configurations it can support.

Get started by sharing your requirements, and our team will get back to with a concept in 72 hours.

Who we work with

Our mission is to make electrification possible and compelling for every vehicle OEM on the planet.

This means working with specialist vehicle OEMs who want to bring leading electrified products to market, but feel underserved by traditional battery pack Tier 1s.

Designed for:
buses
Super car
HGV
Auxillary battery packs
Marine
Alexander Dennis

IONETIC are working with Alexander Dennis to develop a next generation battery pack. Designed to address the leading challenges faced by bus manufacturers in 2024, the system aims to deliver longer operational lifetime, whilst still meeting the competitive range and price point required for operators.

Get in touch

Speak to our team about how we can help deliver your next electrification programme faster, cheaper and with more confidence.